Skip to content
Rim CountryInsider

Plan a Trip

Getting to Rim Country: Routes, Distances, Airports and Winter Driving

Rim Country is a road trip. There’s no airline service and no scheduled bus from Phoenix, so nearly everyone drives up the Beeline Highway (State Route 87) to Payson and fans out from there on SR 87 and SR 260. Here’s how to get here, how far it is, what’s under construction, and how to handle winter roads.

The short version

  • From Phoenix: about 90 miles, roughly an hour and a half, on SR 87 (the Beeline Highway).
  • Flying in: Phoenix Sky Harbor is the nearest airline airport. Payson’s airport is general aviation only.
  • Construction: SR 260 widening in Star Valley (lane restrictions on weekdays) and SR 87 repaving through Payson, set to finish in late 2026.
  • Winter: check AZ 511 before you go; ADOT can require chains or four-wheel drive during storms.

From Phoenix: the Beeline Highway (SR 87)

The Town of Payson’s directions start at Shea Boulevard in Scottsdale and run about 70 miles north on SR 87; from central Phoenix it’s about 90 miles. The Beeline is a four-lane highway all the way from the Valley to Payson, climbing from about 1,500 feet near Fountain Hills to about 4,890 feet in Payson, according to ADOT. Along the way, SR 188 branches off toward Roosevelt Lake and Globe.

Plan for more traffic on weekends: ADOT runs separate weekend signal timing in Payson because weekend traffic is heavier.

From other directions

These distances are estimates from highway mileposts. Between Payson and the top of the Rim, SR 87 and SR 260 share the same road for about 25 miles, through Pine and Strawberry.

Flying in

Getting around once you’re here

Construction (as of November 2026)

Live road conditions

Current closures, incidents and construction on SR 87, SR 260 and SR 188, straight from ADOT’s AZ 511. For highway cameras and the weather, see our Rim Country conditions page.

Road Conditions
SR 260Construction work on SR-260 Eastbound from MP 255 to MP 258 . All lanes closed. 12/3/2026 10:00 AM to 12/3/2026 12:00 PM
SR 260Construction work on SR-260 Westbound from MP 258 to MP 255 . All lanes closed. 12/3/2026 10:00 AM to 12/3/2026 12:00 PM
SR 260Construction work on SR-260 Eastbound from MP 255 to MP 258 . All lanes closed. 11/24/2026 10:00 AM to 11/24/2026 12:00 PM
SR 260Construction work on SR-260 Westbound from MP 258 to MP 255 . All lanes closed. 11/24/2026 10:00 AM to 11/24/2026 12:00 PM
See all at AZ511 →
Source: AZ511 · updated 3:14 PM

Winter driving

Snow is common from December to March, especially on the climbs up the Rim on SR 87 north of Strawberry and SR 260 east of Christopher Creek. Arizona doesn’t have a standing chain law; ADOT issues chain or four-wheel-drive requirements and recommendations storm by storm, and has closed SR 260 between Star Valley and Heber-Overgaard during big storms. Studded tires are legal from Oct. 1 to May 1.

EV charging

According to the U.S. Department of Energy’s station locator, Payson has public DC fast charging at the Electrify America station at 400 E. Highway 260, the Tesla Supercharger at 142 AZ-260 and the Circle K at 1009 S. Beeline Highway, all open 24 hours. The locator lists no public DC fast chargers in Pine, Strawberry, Christopher Creek or on top of the Rim, so charge up in Payson. The next fast chargers are in Show Low, Winslow and Camp Verde.

Plan the rest of your trip

See when to visit, where to stay, our community guides and more trip planning guides.